Operations History


Jun–Jul 2008

ConocoPhillips Amborip IV

2D Marine Survey

Arafura Sea


Consultancy Services & Vessel Tracking System.

Providing: Acquisition Consultant, Vessel Coordinator QC. For the 2D Marine Seismic Survey, conducted by Wavefield vessel “Bergen Surveyor”.

 

Jun 2008 – Ongoing

PAN – TAC PERTAMINA

3D Marine Survey

Natuna Sea


Providing consultancy support for QC personnel, Nav, Acquisition, Processing, and Coordinator of the operations for the 3d High Resolution Seismic Project. Plus Interpretation Services.

 

Jun 2008-Ongoing

KANGEAN Energy Indonesia

Bathymetry Survey

Java Sea


Bathymetry survey, all over the West Block 400Sqkms Using MBES, SSS, USBL, mapping the 3D marine survey area, to assure is free of any pinnacle that could damage the Streamers of the survey vessel, plus covering an area for Transition zone Survey.

 

Jun 2008

KNOC

Geological Study

Java Sea Block


Geological Study.

 

May 2008

PAN-TAC PERTAMINA

Bathymetric & Site Survey (2)

Natuna Sea


Conducted a Bathymetry survey over the entire block-Udang Field. Consisting of: MBES, SSS, Magnetometer, Sub-Bottom Profile, plus 2 Site survey of 2Km X 2Km.

 

Apr-2008-Ongoing

ConocoPhillips / Statoil Hydro Consultancy Services

3D Seismic Survey

Kuma Karama Block/Makassar Strait-Indonesia


Kuma Karama Block, Makassar Strait Indonesia 3D Marine Survey Quality Control

Personnel: Acquisition, Navigation, and Coordinator: Fugro Geo-Atlantic Vessel 10 streamers Survey.

 

Jan-May 2008

Marathon Indonesia

Consultancy Services

Pasangkayu Block / Makassar Strait


Pasangkayu block Makassar Strait Indonesia 3D Marine Acquisition Quality control Personnel: Acquisition, Navigation, Fast track Processing and HSE, on Wavefield Champion 3D Vessel, 10 streamer survey.

 

Dec-2007 Apr 2008

ConocoPhillips Australia

Consultancy Services

Offshore Australia


Quality Control Personnel: (Acquisition, Navigation, Processing, and Coordinator QC. For 3D Marine Acquisition 10 streamers (Fugro Geo-Atlantic).

 

Sep-2007

ConocoPhillips Indonesia


Site Survey

Natuna Sea


Site Survey Operations using MBES and SSS for site clearance of Belida & Belanak Platforms.

 

Aug 2007-June 2008

TATELY N.V

Consultancy Services

Jakarta Office


Data Processing PSDM & Acquisition QC Services.

 

Jul – Aug 2007

ConocoPhillips Indonesia

Geotechnical Site Survey

Natuna Sea


Geotechnical Site Survey Operation In South Belut Area, acquired 24 bore holes, for 2

Jack-Up Locations.

 

Jun 2007 – May 2008

Mobil Cepu Ltd

Consultancy Services

Jakarta Office


Geophysical Operation – QA & QC Specialist Services (2 Person).

 

Jun 2007

ConocoPhillips Indonesia

Site Survey

Natuna Sea


Site Survey Operation using MBES and SSS for site clearance for the Belida - Platform Drilling Location.

 

May 2007-Ongoing

ConocoPhillips Indonesia

Geophysical Coordinator Services

Jakarta Office


3D Marine Data Acquisition and G & G Support.

 

Mar 2007- Mar 2008

Medco E&P Indonesia

Data Transcription

Jakarta Office


Data Transcription Services for 12.000 tapes for Kampar Block, Madura – Tomori, South Sumatra, Central Sumatra block and 3D Tarakan.

 

Feb 2007

ExxonMobil Indonesia

Consultancy Services

Makassar Strait


Acquisition Project Manager.

 

Feb 2007

ConocoPhillips Indonesia

Site Survey

Natuna Sea


Site Survey Operation using MBES and SSS for site clearance for the Belida Drilling and Kerisi Platform Area.

 

Dec 2006-Mar 2007

ConocoPhillips Indonesia

Data Transcription

Jakarta Office


Data Transcription Services for 8.000 tapes.

 

Dec 2005-Dec 2006

KNOC/PETRONAS

Drilling Services

Supervisors

Rig Site (Madura & Timika) & Jakarta Office


Drilling Supervisor (4) persons (Day & Night supervisors).

 

Dec 2005– Dec 2006

KNOC / PETRONAS

Geologist Service

At Rig Site


Rig Site (Madura & Timika) & Jakarta Office


Wellsite Geologist Consultant – 2 (two) persons.

 

Nov 2006


ConocoPhillips Australia

Consultancy Services

Jakarta Office


3D Marine Data Acquisition / Processing Support office.

 

Oct 2006-Ongoing

ConocoPhillips Indonesia

Consultancy Services

Natuna Sea & Jakarta Office


TQCR Consultancy Services for Rig Positioning Services & VTS (vessel tracking system) for the vessel around the CoPI Productions fields.

 

Oct2006 – Feb 2007

ConocoPhillips Indonesia

Consultancy Services

Jakarta Office


2D Marine Data Acquisition and G & G Services.

 

Aug 2006-Dec 2006

KNOC/PETRONAS

Consultancy Services

Jakarta Office


Drilling Superintended Services.

 

Jan 2006-Oct2006

ConocoPhillips Indonesia

Consultancy Services

Natuna Sea & Jakarta Office


QC 3D Marine Processing QC Services.

 

Dec 2005-Mar 2006

ConocoPhillips China

3D Marine Seismic

Beijing


3D Navigation Processing QC Services, On Bin-Hai Seismic Vessel 6 streamers.

 

Nov 2005-Dec 2006

ConocoPhillips Indonesia

Consultancy Services

Jakarta office


2D Seismic Planning Services.

 

Oct – Dec 2005

KNOC

Consultancy Services

Jakarta Office & East Java


2D Seismic Processing QC Services.

 

Sept – Nov 2005

KNOC

Consultancy Services

Jakarta office


New Blocks (2) Evaluation Study (Geological & Geophysical).

 

Aug – Dec-2005

ENI Indonesia

2D Marine Services

Jakarta Office


2D Seismic Planning & Contracts Bids preparations and G &G in Krueng Mane Block.

Provision for: Acquisition, Processing, Vessel Coordinator personnel,+ 4 VTS Systems.

 

Jul – Aug 2005

KNOC

Consultancy Services

Java Sea


2D Acquisition QC and Data Processing QC Services on Multiwave 2D vessel Pacific Titan.

 

May – Aug 2005

ENI Indonesia

2D Marine Services

Jakarta


2D Marine Survey (3) planning, Contracts Bid Preparation / Evaluation.

2D Survey conducted by Fugro Polar Duke. Provision for: Acquisition, and Cv Coordinator, plus 3 VTS Systems..

 

Mar-05 – Apr 06

ConocoPhillips Indonesia

Vessel Tracking Services

Field


Complete the VTS (vessel tracking system) for 17 vessels around the CoPI production fields.

 

Mar – Apr 2005

KNOC

Consultancy Services

Jakarta – Wokam


2D / 3D Data Processing Services.

 

Feb – Apr 2005

EMP Kangean

Consultancy Services

Jakarta Office


3D / 2D Marine / Land / TZ Seismic Planning.

 

Jan– Mar 2005

ENI Indonesia

Consultancy Services

Jakarta Office & Field


2D Seismic Survey Planning / Contract & Bids.

 

Dec 2004 – Jul 2006

KNOC

Drilling Services

Superintended.

Jakarta Office


Drilling Superintendent Services for 3 (three) persons.

 

Nov-Dec 2004

KNOC

Consultancy Services

Jakarta Office & Field


3D / 2D Data Processing QC, C&G Support Services.

 

Apr – Jul 2004

SYNERGY

Consultancy Services

Jakarta Office & Field


Safety Evaluation of several Rigs, of Total / Unocal / Santos/ ConocoPhillips Indonesia / PERTAMINA.

 

Jan 2004 -Jan 2006

ConocoPhillips Indonesia

Site Survey &

Consultancy

Jakarta Office


3D data processing QC, C&G support 2 years contract RIG Move support & pipeline survey QC.

 

Nov-2003 -Jan 2004

ENI Indonesia

3D Marine Survey

Jakarta Office &

Muara Bakau 3D


Contract & Bids Preparation For 3D Marine Survey In Muara Bakau block, Office G&G Operation Support for : 3D vessel Geco Emerald, Provision for: Acquisition, Navigation and Chase vessel Coordinator, plus 3 VTS systems..

 

Oct – Dec 2003

ConocoPhillips Indonesia

Consultancy Services

Jakarta Office


3D Processing QC, G&G Support Services.

 

Sept 2003-Mar 2004

XL-Comindo / NSW

Site Survey

Kawinda, Senggigi, Bulo-Bulo, Sangata


Cable Land Survey.

 

Apr – Oct 2003

ENI Indonesia

Consultancy Services

Tarakan Sea


Office G &G Operation support, 3 VMS support + Operation 2D Marine Seismic : “Veritas Searcher” Vessel, Provision for Acquisition Qc, Processing Qc, and C vessel Coordinator.

 

Feb – Dec2003

ConocoPhillips Indonesia

Consultancy Services

Natuna Sea & Java Sea


RIG Move Support Services.

 

Jan – Dec 2002

ConocoPhillips Indonesia

Consultancy Services

Natuna Sea


Office G &G support, 2D Marine Seismic 1700kms, (Western Horizon) ADGF Pipeline survey support, and Rig Moves. Provision of: Acquisition, Navigation, Geodetic Surveyors, and Operations Coordinator.

 

Oct 2001 – Feb 2002

Gulf Resources

3D Marine Survey

Java Sea


3D Marine Seismic 6strm 2600Sqkm, 3 VMS support, and Vessel Coordinator, Acquisition QC.

 

Jan – Sept 2001

INPEX Masela

3D Marine Survey

Masela Block Timor Sea


Bid Preparation, 3D Contract Preparation & Technical Specifications, and G & G for a 3D Marine Seismic 10 Strm 2100Sqkms project.

 

Jan – Nov 2000

ConocoPhillips Indonesia

3D Marine Survey

Natuna Sea

Gabus Survey


3D Marine Seismic 6 Strm, 2400Sqkms, 6 VMS units + Operation support, 2D Marine Seismic 1200kms, Office G&G Operations Support, 6 wells Rig Move, Belanak Site Survey

Seismic vessel: 3D Geco Emerald.

 

Mar – Dec 1998

ConocoPhillips Indonesia

3D/2D Marine Survey

Natuna Sea


2D Marine Seismic 1200Km,(Western Horizon) and 3D Marine Survey of 1200 Sqkms,(Geco Resolution) Plus, 8 Wells Rig Move, Provision for Acquisition, Navigation, Processing, Chase V. Operator and Ops Coordinator Personnel, including * vessel tracking systems.

 

May – Sept 1997

ConocoPhillips Indonesia

Seismic Survey

Natuna Sea


3D Seismic Survey (6strm), 2000 Sqkms on board Fast Track Processing, 2D Marine Seismic QC 1800kms Western Regent vessel, Provision for Acquisition, Navigation, Processing & Coordinator QC, Plus 2 Vessel coordinators, and 6 Vessel tracking systems.

 

Feb – Sept 1997

ConocoPhillips Indonesia

Rig Moves & Seismic Survey

Natuna Sea


7 Wells Rig Move QC, 1 Well head Search Survey, 2D Marine Seismic QC 1600kms.

 

Sep 1995 – Oct 1997

Conoco Warim BV

Consultancy Services

Warim Block Irian Jaya


Drilling Logistic Coordinator, Helicopters Coordinator, Operations Coordinator Services.

 

Apr 1995- Mar 1996

Conoco Warim BV

Consultancy Services

Warim Block Irian Jaya


2D Seismic Survey (Onshore) 480kms, Provision for personnel services( Acquisition, Surveyor, Processor, Geologists, Plus 12 Field QCS (nationals).