Operations History
Jun–Jul 2008 |
ConocoPhillips Amborip IV |
2D Marine Survey |
Arafura Sea |
|
Consultancy Services & Vessel Tracking System. Providing: Acquisition Consultant, Vessel Coordinator QC. For the 2D Marine Seismic Survey, conducted by Wavefield vessel “Bergen Surveyor”. |
||
Jun 2008 – Ongoing |
PAN – TAC PERTAMINA |
3D Marine Survey |
Natuna Sea |
|
Providing consultancy support for QC personnel, Nav, Acquisition, Processing, and Coordinator of the operations for the 3d High Resolution Seismic Project. Plus Interpretation Services. |
||
Jun 2008-Ongoing |
KANGEAN Energy Indonesia |
Bathymetry Survey |
Java Sea |
|
Bathymetry survey, all over the West Block 400Sqkms Using MBES, SSS, USBL, mapping the 3D marine survey area, to assure is free of any pinnacle that could damage the Streamers of the survey vessel, plus covering an area for Transition zone Survey. |
||
Jun 2008 |
KNOC |
Geological Study |
Java Sea Block |
|
Geological Study. |
||
May 2008 |
PAN-TAC PERTAMINA |
Bathymetric & Site Survey (2) |
Natuna Sea |
|
Conducted a Bathymetry survey over the entire block-Udang Field. Consisting of: MBES, SSS, Magnetometer, Sub-Bottom Profile, plus 2 Site survey of 2Km X 2Km. |
||
Apr-2008-Ongoing |
ConocoPhillips / Statoil Hydro Consultancy Services |
3D Seismic Survey |
Kuma Karama Block/Makassar Strait-Indonesia |
|
Kuma Karama Block, Makassar Strait Indonesia 3D Marine Survey Quality Control Personnel: Acquisition, Navigation, and Coordinator: Fugro Geo-Atlantic Vessel 10 streamers Survey. |
||
Jan-May 2008 |
Marathon Indonesia |
Consultancy Services |
Pasangkayu Block / Makassar Strait |
|
Pasangkayu block Makassar Strait Indonesia 3D Marine Acquisition Quality control Personnel: Acquisition, Navigation, Fast track Processing and HSE, on Wavefield Champion 3D Vessel, 10 streamer survey. |
||
Dec-2007 Apr 2008 |
ConocoPhillips Australia |
Consultancy Services |
Offshore Australia |
|
Quality Control Personnel: (Acquisition, Navigation, Processing, and Coordinator QC. For 3D Marine Acquisition 10 streamers (Fugro Geo-Atlantic). |
||
Sep-2007 |
ConocoPhillips Indonesia
|
Site Survey |
Natuna Sea |
|
Site Survey Operations using MBES and SSS for site clearance of Belida & Belanak Platforms. |
||
Aug 2007-June 2008 |
TATELY N.V |
Consultancy Services |
Jakarta Office |
|
Data Processing PSDM & Acquisition QC Services. |
||
Jul – Aug 2007 |
ConocoPhillips Indonesia |
Geotechnical Site Survey |
Natuna Sea |
|
Geotechnical Site Survey Operation In South Belut Area, acquired 24 bore holes, for 2 Jack-Up Locations. |
||
Jun 2007 – May 2008 |
Mobil Cepu Ltd |
Consultancy Services |
Jakarta Office |
|
Geophysical Operation – QA & QC Specialist Services (2 Person). |
||
Jun 2007 |
ConocoPhillips Indonesia |
Site Survey |
Natuna Sea |
|
Site Survey Operation using MBES and SSS for site clearance for the Belida - Platform Drilling Location. |
||
May 2007-Ongoing |
ConocoPhillips Indonesia |
Geophysical Coordinator Services |
Jakarta Office |
|
3D Marine Data Acquisition and G & G Support. |
||
Mar 2007- Mar 2008 |
Medco E&P Indonesia |
Data Transcription |
Jakarta Office |
|
Data Transcription Services for 12.000 tapes for Kampar Block, Madura – Tomori, South Sumatra, Central Sumatra block and 3D Tarakan. |
||
Feb 2007 |
ExxonMobil Indonesia |
Consultancy Services |
Makassar Strait |
|
Acquisition Project Manager. |
||
Feb 2007 |
ConocoPhillips Indonesia |
Site Survey |
Natuna Sea |
|
Site Survey Operation using MBES and SSS for site clearance for the Belida Drilling and Kerisi Platform Area. |
||
Dec 2006-Mar 2007 |
ConocoPhillips Indonesia |
Data Transcription |
Jakarta Office |
|
Data Transcription Services for 8.000 tapes. |
||
Dec 2005-Dec 2006 |
KNOC/PETRONAS |
Drilling Services Supervisors |
Rig Site (Madura & Timika) & Jakarta Office |
|
Drilling Supervisor (4) persons (Day & Night supervisors). |
||
Dec 2005– Dec 2006 |
KNOC / PETRONAS |
Geologist Service At Rig Site
|
Rig Site (Madura & Timika) & Jakarta Office |
|
Wellsite Geologist Consultant – 2 (two) persons. |
||
Nov 2006
|
ConocoPhillips Australia |
Consultancy Services |
Jakarta Office |
|
3D Marine Data Acquisition / Processing Support office. |
||
Oct 2006-Ongoing |
ConocoPhillips Indonesia |
Consultancy Services |
Natuna Sea & Jakarta Office |
|
TQCR Consultancy Services for Rig Positioning Services & VTS (vessel tracking system) for the vessel around the CoPI Productions fields. |
||
Oct2006 – Feb 2007 |
ConocoPhillips Indonesia |
Consultancy Services |
Jakarta Office |
|
2D Marine Data Acquisition and G & G Services. |
||
Aug 2006-Dec 2006 |
KNOC/PETRONAS |
Consultancy Services |
Jakarta Office |
|
Drilling Superintended Services. |
||
Jan 2006-Oct2006 |
ConocoPhillips Indonesia |
Consultancy Services |
Natuna Sea & Jakarta Office |
|
QC 3D Marine Processing QC Services. |
||
Dec 2005-Mar 2006 |
ConocoPhillips China |
3D Marine Seismic |
Beijing |
|
3D Navigation Processing QC Services, On Bin-Hai Seismic Vessel 6 streamers. |
||
Nov 2005-Dec 2006 |
ConocoPhillips Indonesia |
Consultancy Services |
Jakarta office |
|
2D Seismic Planning Services. |
||
Oct – Dec 2005 |
KNOC |
Consultancy Services |
Jakarta Office & East Java |
|
2D Seismic Processing QC Services. |
||
Sept – Nov 2005 |
KNOC |
Consultancy Services |
Jakarta office |
|
New Blocks (2) Evaluation Study (Geological & Geophysical). |
||
Aug – Dec-2005 |
ENI Indonesia |
2D Marine Services |
Jakarta Office |
|
2D Seismic Planning & Contracts Bids preparations and G &G in Krueng Mane Block. Provision for: Acquisition, Processing, Vessel Coordinator personnel,+ 4 VTS Systems. |
||
Jul – Aug 2005 |
KNOC |
Consultancy Services |
Java Sea |
|
2D Acquisition QC and Data Processing QC Services on Multiwave 2D vessel Pacific Titan. |
||
May – Aug 2005 |
ENI Indonesia |
2D Marine Services |
Jakarta |
|
2D Marine Survey (3) planning, Contracts Bid Preparation / Evaluation. 2D Survey conducted by Fugro Polar Duke. Provision for: Acquisition, and Cv Coordinator, plus 3 VTS Systems.. |
||
Mar-05 – Apr 06 |
ConocoPhillips Indonesia |
Vessel Tracking Services |
Field |
|
Complete the VTS (vessel tracking system) for 17 vessels around the CoPI production fields. |
||
Mar – Apr 2005 |
KNOC |
Consultancy Services |
Jakarta – Wokam |
|
2D / 3D Data Processing Services. |
||
Feb – Apr 2005 |
EMP Kangean |
Consultancy Services |
Jakarta Office |
|
3D / 2D Marine / Land / TZ Seismic Planning. |
||
Jan– Mar 2005 |
ENI Indonesia |
Consultancy Services |
Jakarta Office & Field |
|
2D Seismic Survey Planning / Contract & Bids. |
||
Dec 2004 – Jul 2006 |
KNOC |
Drilling Services Superintended. |
Jakarta Office |
|
Drilling Superintendent Services for 3 (three) persons. |
||
Nov-Dec 2004 |
KNOC |
Consultancy Services |
Jakarta Office & Field |
|
3D / 2D Data Processing QC, C&G Support Services. |
||
Apr – Jul 2004 |
SYNERGY |
Consultancy Services |
Jakarta Office & Field |
|
Safety Evaluation of several Rigs, of Total / Unocal / Santos/ ConocoPhillips Indonesia / PERTAMINA. |
||
Jan 2004 -Jan 2006 |
ConocoPhillips Indonesia |
Site Survey & Consultancy |
Jakarta Office |
|
3D data processing QC, C&G support 2 years contract RIG Move support & pipeline survey QC. |
||
Nov-2003 -Jan 2004 |
ENI Indonesia |
3D Marine Survey |
Jakarta Office & Muara Bakau 3D |
|
Contract & Bids Preparation For 3D Marine Survey In Muara Bakau block, Office G&G Operation Support for : 3D vessel Geco Emerald, Provision for: Acquisition, Navigation and Chase vessel Coordinator, plus 3 VTS systems.. |
||
Oct – Dec 2003 |
ConocoPhillips Indonesia |
Consultancy Services |
Jakarta Office |
|
3D Processing QC, G&G Support Services. |
||
Sept 2003-Mar 2004 |
XL-Comindo / NSW |
Site Survey |
Kawinda, Senggigi, Bulo-Bulo, Sangata |
|
Cable Land Survey. |
||
Apr – Oct 2003 |
ENI Indonesia |
Consultancy Services |
Tarakan Sea |
|
Office G &G Operation support, 3 VMS support + Operation 2D Marine Seismic : “Veritas Searcher” Vessel, Provision for Acquisition Qc, Processing Qc, and C vessel Coordinator. |
||
Feb – Dec2003 |
ConocoPhillips Indonesia |
Consultancy Services |
Natuna Sea & Java Sea |
|
RIG Move Support Services. |
||
Jan – Dec 2002 |
ConocoPhillips Indonesia |
Consultancy Services |
Natuna Sea |
|
Office G &G support, 2D Marine Seismic 1700kms, (Western Horizon) ADGF Pipeline survey support, and Rig Moves. Provision of: Acquisition, Navigation, Geodetic Surveyors, and Operations Coordinator. |
||
Oct 2001 – Feb 2002 |
Gulf Resources |
3D Marine Survey |
Java Sea |
|
3D Marine Seismic 6strm 2600Sqkm, 3 VMS support, and Vessel Coordinator, Acquisition QC. |
||
Jan – Sept 2001 |
INPEX Masela |
3D Marine Survey |
Masela Block Timor Sea |
|
Bid Preparation, 3D Contract Preparation & Technical Specifications, and G & G for a 3D Marine Seismic 10 Strm 2100Sqkms project. |
||
Jan – Nov 2000 |
ConocoPhillips Indonesia |
3D Marine Survey |
Natuna Sea Gabus Survey |
|
3D Marine Seismic 6 Strm, 2400Sqkms, 6 VMS units + Operation support, 2D Marine Seismic 1200kms, Office G&G Operations Support, 6 wells Rig Move, Belanak Site Survey Seismic vessel: 3D Geco Emerald. |
||
Mar – Dec 1998 |
ConocoPhillips Indonesia |
3D/2D Marine Survey |
Natuna Sea |
|
2D Marine Seismic 1200Km,(Western Horizon) and 3D Marine Survey of 1200 Sqkms,(Geco Resolution) Plus, 8 Wells Rig Move, Provision for Acquisition, Navigation, Processing, Chase V. Operator and Ops Coordinator Personnel, including * vessel tracking systems. |
||
May – Sept 1997 |
ConocoPhillips Indonesia |
Seismic Survey |
Natuna Sea |
|
3D Seismic Survey (6strm), 2000 Sqkms on board Fast Track Processing, 2D Marine Seismic QC 1800kms Western Regent vessel, Provision for Acquisition, Navigation, Processing & Coordinator QC, Plus 2 Vessel coordinators, and 6 Vessel tracking systems. |
||
Feb – Sept 1997 |
ConocoPhillips Indonesia |
Rig Moves & Seismic Survey |
Natuna Sea |
|
7 Wells Rig Move QC, 1 Well head Search Survey, 2D Marine Seismic QC 1600kms. |
||
Sep 1995 – Oct 1997 |
Conoco Warim BV |
Consultancy Services |
Warim Block Irian Jaya |
|
Drilling Logistic Coordinator, Helicopters Coordinator, Operations Coordinator Services. |
||
Apr 1995- Mar 1996 |
Conoco Warim BV |
Consultancy Services |
Warim Block Irian Jaya |
|
2D Seismic Survey (Onshore) 480kms, Provision for personnel services( Acquisition, Surveyor, Processor, Geologists, Plus 12 Field QCS (nationals). |
||